Code of practice for grid connected solar photovoltaic systems
The Code of Practice for Grid Connected Solar Photovoltaic Systems was published in 2014 by the Institution of Engineering and Technology (IET). It was written by IET Standards with expert technical input from the BRE National Solar Centre.
The IET is one of the world’s largest engineering institutions with nearly 160,000 members in 127 countries, covering; energy, transport, manufacturing, information and communications, and the built environment. The BRE National Solar Centre (NSC) was established in 2012 to provide independent evidence-based information about solar energy systems and related topics.
The Code of Practice (CoP) gives designers and installers of solar photovoltaic (PV) system the knowledge they need to ensure that their systems comply with UK and international standards and good practice. It is suitable for all scales of installation, from small domestic systems to large scale PV farms. As well as industry practitioners, the CoP will be of interest to customers, owners, investors, insurers and financiers of solar PV systems.
The CoP updates UK industry practice to ensure installation of grid-connected solar photovoltaic (PV) systems in the UK is safe, effective and fit-for-purpose. In the latest edition, system earthing, fault alarms, fusing, connectors and fire detection have been reviewed in detail, with key changes made to support good practice in the UK and to align with international standards.
- All parts of a grid-connected solar PV system up to and including the connection to the AC mains.
- Low voltage and high voltage connections and components.
- Building-mounted, building-integrated and ground-mounted systems.
- Grid-connected systems with battery storage.
Jonny Williams, Director of the BRE National Solar Centre said, “The Code of Practice raises the bar for quality in the UK solar PV industry… Its publication follows extensive industry consultation and peer review – receiving more than 400 comments – resulting in guidance that is both technically robust and readily useable by everyone involved. With the solar industry making an important and growing contribution to cost-effective low-carbon electricity provision in the UK, it is crucial that all systems are designed, installed and maintained to a high quality standard – the new CoP will be a valuable tool in achieving that goal.”
Martin Cotterell, BRE National Solar Centre Associate, and expert technical author for the CoP said, “The Code of Practice represents an evolution of existing technical standards. The scope is much broader, with a lot more technical details and a number of advances based on lessons learnt by the industry over the last five years of rapid solar PV development.”
[edit] Related articles on Designing Buildings Wiki
- Battery energy storage systems with grid-connected solar photovoltaics BR 514.
- BRE National Solar Centre.
- BRE photovoltaic certification scheme.
- DC isolators for photovoltaic systems (FB 68).
- Feed in tariff.
- Fuel cell.
- Future of electricity in domestic buildings.
- Green Deal.
- Installation of photovoltaic panels on existing flat roofs - some lessons learned IP 8 14.
- Large scale solar thermal energy.
- Microgeneration.
- Micro-grid.
- Photovoltaics.
- PV inverter.
- Solar thermal systems.
- VAT hike puts brakes on home solar and batteries.
- Zero carbon homes.
- Zero carbon non-domestic buildings.
Featured articles and news
OpenUSD possibilities: Look before you leap
Being ready for the OpenUSD solutions set to transform architecture and design.
Global Asbestos Awareness Week 2025
Highlighting the continuing threat to trades persons.
Retrofit of Buildings, a CIOB Technical Publication
Now available in Arabic and Chinese aswell as English.
The context, schemes, standards, roles and relevance of the Building Safety Act.
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.